Banjë & Moglicë

Banjë,  Moglicë  and  80%  of  hydropower  plants  in Albania have used our trusted products.

Construction   of   Banja   HPP   started   in  2013,   and  it  was  successfully completed  and  put  into  operation  on September  2016.  It  was  a project completed within time and cost.
Banja  Dam is an 80-meter-high embankment dam, which makes it possible to utilize a water storage volume of between 160 and 175 meters above sea level.  Banja  Plant’s  total  installed  capacity  is 72 MW  and  annual  power generation is estimated at 255 GWh. Banja reservoir holds 178 million cubic meters  of   water,   and   its   surface  covers  an  area  of  about   14  square kilometres equivalent to more than 2000 football fields.

Power plants:                                    Banjë & Moglicë
Annual average production:           700 GWh
Installed capacity:                           256 MW